St. Pete Yacht and Tennis Club Seawall Replacement

Client type: Commercial (club / association)
Location: St. Petersburg, FL

The St. Pete Yacht and Tennis Club Association needed to replace roughly 1,500 linear feet of aging seawall that had reached the end of its useful life. Ultramarine Solutions was contracted to deliver a long-term shoreline protection solution that would safeguard the property, surrounding infrastructure, and waterfront amenities for years to come.

An Aging Wall and a Deck in the Way

Years of age, saltwater exposure, and constant tidal action had worn the existing seawall down. Portions were still standing, but the system no longer offered the structural reliability the property needed for long-term protection. The most demanding part of the job was a section of seawall that had to be installed directly beneath an existing cantilevered deck. With limited clearance and restricted access, that stretch called for specialized equipment, careful sequencing, and close coordination to complete the installation without disturbing the structure overhead.

Long-Term Protection, Built Around Tight Access

Ultramarine coordinated demolition, shoreline stabilization, and installation of the new seawall system while keeping the property safe and minimizing disruption to the Association and its residents. Given the length of the run and the varying conditions along the property, the work depended on detailed planning and steady communication between the construction team, the engineers, and the Association to keep everything moving efficiently. The result is a durable system engineered to stand up to the harsh marine environment for the long haul.

  • Replacement of approximately 1,500 linear feet of aging seawall

  • A seawall section installed beneath an existing cantilevered deck

  • Demolition and shoreline stabilization with minimal disruption to residents

  • Coordinated planning across construction, engineering, and the Association

Durable Protection for a Waterfront Community

The completed seawall restored shoreline stability across the property and gave the Association a durable, long-term coastal protection solution designed for the harsh marine environment. The project is a strong example of Ultramarine’s ability to take on large-scale marine construction in difficult access conditions while delivering lasting results for waterfront communities and associations.

0ft
Seawall replaced
0
Section installed beneath a cantilevered deck
0
Composite or vinyl panel size
0
Engineered design life

Protect Your Waterfront for the Long Term

Whether you’re facing a failing seawall, recovering from storm damage, or simply planning ahead, Ultramarine Solutions brings the engineering, permitting, and marine construction experience to get it done right. From the first evaluation through final inspection, we handle the entire process so you can move forward with confidence.