
Turner Residential Seawall
Client Type: Residential
When the Turner property’s seawall failed and caused significant erosion near the home, fast action was critical. Ultramarine applied for an emergency permit, cutting the permitting timeline by approximately four months, and replaced the 130-foot failing wall with a new vinyl seawall with a concrete cap and tiebacks.
The Challenge
The seawall on the Turner property had failed, causing significant erosion that was threatening the home. The situation required both speed and expertise — the permitting process alone could have taken months without the right approach.

Scope of Work


Our Solution
Ultramarine moved quickly to secure an emergency permit and removed the failing 130-foot wall before replacing it with a new vinyl seawall engineered for long-term performance.






